Design Tips · 19 Oct 2026
Designing for Kampala's Two Rainy Seasons
March to May, September to November. Two wet seasons a year is not a detail to design around at the end — it shapes roof, ground and everything in between.
2 min read
From first sketch to approved drawings — concept design, statutory approvals and full construction documentation for residential, commercial and institutional buildings.

From first sketch to approved drawings — concept design, statutory approvals and full construction documentation for residential, commercial and institutional buildings.
The core of the practice. We take a project from a brief and a site through to a set of drawings a contractor can build from, and we stay involved while they do.
Our process is deliberately front-loaded: we spend longer than most practices on the site analysis and the brief, because decisions made in the first three weeks determine most of what the building will cost and how it will perform for the next forty years.
Design Tips · 19 Oct 2026
March to May, September to November. Two wet seasons a year is not a detail to design around at the end — it shapes roof, ground and everything in between.
2 min read
Design Tips · 6 Sep 2026
Sitting on the equator changes the sun path, which changes the shading strategy. Why temperate-climate rules of thumb quietly fail in Kampala.
2 min read
Send us the location, what you want to build and roughly what you have to spend. We will come back within one working day.