Residential · Nakasero, Kampala

Nakasero Ridge Villa

A four-bedroom family house that reads the ridge rather than flattening it — split levels, deep eaves and a courtyard that stays cool through the dry season.

Completed
Location
Nakasero, Kampala
Year
2024
Category
Residential
Client
Private client
Scale
640 m² GFA · 0.4 acre site

The project

Nakasero Ridge sits on a steep quarter-acre plot with a fourteen-metre fall from road to boundary. Rather than cut a level platform and retain it — the default on this hill — we let the house step down the slope in three half-levels, so the earthworks stayed under 120 cubic metres and every room found its own view over the valley.

Reading the site

The entry sits at road level, deliberately modest: a board-marked concrete wall, a slot of light, and a single mvule door. From there the house unfolds downward. Living spaces occupy the middle level and open onto a shaded courtyard; bedrooms take the lowest terrace where the ground is coolest and the traffic noise from Kyadondo Road has fallen away.

Keeping cool without machinery

Kampala sits almost exactly on the equator, so the sun is high year-round and the real enemy is the low western sun of the late afternoon. A 1.8-metre eave shades the north and south glazing completely between 10am and 4pm; the west elevation is closed down to slot windows behind a screen of vertical eucalyptus fins.

  • Cross-ventilation on every level via the courtyard stack
  • Exposed concrete soffits provide thermal mass that flattens the daily temperature swing
  • Roof-mounted PV covers the household's daytime base load
  • A 22,000-litre rainwater tank carries the garden through both dry seasons

Materials

The palette is short and local: fair-faced concrete, hand-pressed clay brick from Kajjansi, eucalyptus screens and honed Karamoja granite for the floors. Nothing here needs a maintenance contract or an imported spare part.

The brief asked for a house that would still look right in thirty years. That meant resisting every finish that dates — and trusting concrete, brick and timber to age well.

The project was completed in March 2024, eleven months from ground-breaking, and came in 4% under the construction budget.

Start here

Send us the plot, the brief, or just a rough idea of what you want to build. The first conversation costs nothing, and we will tell you honestly whether we are the right practice for it.