An architectural practice built around the site
We design residential, commercial and institutional buildings across Uganda, and stay involved while they are built.
The first three weeks decide most of it
We spend longer than most practices on the site analysis and the brief. Orientation, slope, drainage, the way the wind moves across the plot and where the sun lands in March and in September - these set what the building will cost to build and what it will cost to run for the next forty years.
Everything after that is detail. Important detail, but detail.

Four things we do not compromise on
Passive before mechanical
Shading, orientation and cross ventilation come first. Air conditioning is what is left over, not the starting point.
Materials that belong here
Kajjansi brick, mvule, local granite and terrazzo. A short supply chain, and finishes that age well in this climate.
Approvals are our job
KCCA and district submissions are managed by us, not handed back to the client with a list of problems.
On site until handover
Inspections and contract administration, so the building that goes up is the one that was drawn.
Tell us about your site
Send the location, what you want to build and roughly what you have to spend.